The savings achieved are set to provide a Return On Investment (ROI) of 2-3 years.
Efficient Power Solutions installed a 250 KVA eVO+R unit to the main supply for the shopping centre and a 150 KVA
eVO+R unit to the car park supply, closely regulating the site voltage from highs of 246V down to 220V.
This provides plant and equipment with optimal & stabilised voltage, delivering energy saving and improved equipment life expectancy benefits, by consistently operating electrical loads at their design voltage.
To read more download our case study.